Sword and Shield
← Training Programs

Program overview

12-Weeks Cultivating Mass Training Plan

Review the program, equipment, and experience guidance before you start.

12 weeks84 scheduled sessions6 training/recovery sessions per week

Program intention

Maximize muscle hypertrophy and overall size through high-volume, multi-frequency training across a 12-week block.

About this program

High-volume hypertrophy program designed to cultivate serious mass. Push / Pull / Legs / Upper / Lower / Conditioning split repeated for 12 weeks. Emphasis on progressive overload, controlled eccentrics, and chasing the pump. Rest 60–120 seconds on compounds, 45–75 seconds on isolation. Eat in a surplus, sleep 7–9 hours, and train with intent. Swole is the goal. Size is the prize.

Suggested fitness level

intermediate

Intermediate lifter. Aim to add weight or reps over the 12 weeks while keeping form strict. Last set of lateral raises to failure. Use 75–80% 1RM on main bench and 70–75% on deadlifts as starting points. Conditioning is Zone 2 (conversational) - choose run, ruck, or assault bike. Deload or reduce volume if recovery lags. Prioritize progressive overload and calorie surplus for maximum size gains.

Required equipment

  • Barbell
  • Dumbbells
  • Cable machine
  • Pull-up / dip station
  • Squat rack
  • Bench (flat and incline)
  • Sandbag
  • Resistance bands
  • Battle ropes

Suggested equipment

  • Trap bar
  • Assault bike
  • Rucking pack
  • Leg press or additional machines

Sign in to start

You can browse the program now. Sign in to save your progress.

Sign in